Baross Gábor bridge
Design services
During the comprehensive renovation and partial reconstruction, the contractor completely rebuilt the superstructure in the four outermost spans on both sides of the 130-metre-long bridge. The two outermost piers were also completely rebuilt, the remaining piers were reinforced, while steel main girders and reinforced concrete structural components were renovated.
130 m long
12spans