Referenciáink

Development of the M4 high-speed road

Design and Engineer services

CONSTRUCTION OF PEST COUNTY SECTION

SECTION BETWEEN ÜLLŐ – CEGLÉD

Engineer: UTIBER Kft

44,4 kmlong

8 multi level interchanges

20 structures

2 rest area

2×2 lanes

CONSTRUCTION OF PEST COUNTY SECTION

SECTION BETWEEN CEGLÉD – ABONY

Chief designer: ÚT-TESZT Kft.

17,6 km long

2 multi-level interchanges

4 structures

1 rest area

2×2 lanes

CONSTRUCTION OF HAJDÚ-BIHAR COUNTY SECTION
SECTION BETWEEN BERETTYÓÚJFALU AND NAGYKEREKI (STATE BORDER), PHASE I. (2+550-5+500 KM)

Chief designer: UTIBER Kft.

2,95 km long

1 multi-level interchange

3 structures

1 O & M centre

2×2 lanes

CONSTRUCTION OF HAJDÚ-BIHAR COUNTY SECTION
SECTION BETWEEN BERETTYÓÚJFALU AND NAGYKEREKI (STATE BORDER), PHASE II. (5+500-15+675 KM)

Chief designer: UTIBER Kft.

10,2 km long

8 structures

1 O & M centre

2×2 lanes

 

x

Az UTIBER Kft számára kiemelten fontos a munkavállalók védelme. A kormányzati intézkedésekkel összhangban, a koronavírussal való fertőzés kockázatának csökkentése érdekében megelőző intézkedéseket rendeltünk el. Munkavállalóinkat folyamatosan tájékoztatjuk a szükséges lépésekről, tájékoztatókat adunk ki a szigorú higiéniai előírások és elvárások betartásával kapcsolatban.

A zavartalan működés fenntartása érdekében technikai átállást valósítottunk meg, munkavállalóinknak - munkakörtől függően - otthoni munkavégzést biztosítottunk, ezzel is törekedve a személyes interakciók számának csökkentésére.

A munkavégzés színvonalának fenntartása mellett kérjük partnereinket, ügyfeleinket, hogy kapcsolattartás érdekében mérlegeljék, elengedhetetlen-e az UTIBER Kft. székházában, telephelyeinken történő személyes találkozás és az egyeztetéseket lehetőség szerint online platformon folytassák le. Munkatársaink állnak rendelkezésre a megadott elérhetőségeken, továbbiakban az Ügyvezetés az Igazgatói Titkárságok a napi szinten ellátandó feladatok elvégzése céljából ügyeletet tart.

Top